    Branded EGStoltzfus Homes trailer for Legacy Crossing on a gravel pad, with excavators, bulldozers and other heavy equipment grading the future community site under a sunset sky.
    Now selling at Legacy Crossing
    View Homesites & More
  • Custom Homes & Remodeling
    • Explore Custom Homes
    • Design-Build Experience
    • Where We Build
    • Remodeling & Renovations
    Kitchen Remodel
    Transform your home into your dream space.
    Remodeling & Renovations
  • Design Studio
    • Explore Our Design Studio
    • Design Style Quiz
    • Homeowner Tips & Tricks
    • Lookbook
    Design Studio
    Explore our new Design Studio catalog!
    Request Catalog
  • Lookbook
  • Why EGS
  • Customer Care
  • Contact

Our ProcessWith You At Every Step

Whether you’re building a new neighborhood home or designing a custom build from the ground up, we’re with you from start to finish. Our time-tested processes will guide you through every milestone – from initial vision and selections to construction and beyond – making your EGS journey simple, transparent, and most of all enjoyable.

Stage 1Initial Home Selections, Financing & Agreement

  • Choose your homesite, plan, and architectural options
  • Meet with our preferred lender and secure your financing
  • Sign your agreement of sale documents
Watch video

Stage 2Design Studio Selections & Authorizations

  • Make your preliminary design selections at your selection appointment
  • During your finalization appointment, you’ll finalize and complete your design
  • Authorize your design studio addendum and home plan prints
Watch video

Stage 3Building Your Home

  • Before groundbreaking, your pre-construction team mobilizes behind the scenes
  • Watch your new EGS home comes to life
  • Visit for a progress update at your mechanical orientation
Watch video

Stage 4Your New Story Begins

  • See your completed home at your new home orientation
  • Get the keys to your new home at closing
  • Submit your customer satisfaction survey
  • End your EGS homeownership journey with a one-year homeowner follow-up
Watch video

Gate 1Discovery

You Give Us: Your vision and goals for your project

We Give You: A sketch & ballpark budget number

  • You’ll meet with a Design-Build Specialist to share your vision for your project
  • Our team will create a preliminary sketch plan of the project so you have a visual of what we’ve discussed
  • We’ll also get you a feasibility budget so you have a ballpark range of what this project investment level would look like

Gate 2Design & Evaluation

You Give Us: The initial investment and go-ahead to start dialing in your vision

We Give You: A 3D model and proposal

Phase I

  • We develop your sketch into a 3D model with the goal of designing both the flow and function of your project

Phase II

  • Once that model is in place, you’ll work with our design professionals to select all the unique design elements of your project such as fixtures, flooring, cabinets, and countertops
  • When you’re finished with those selections, we can present a proposal and finished design plan that shows all the elements and features we collaborated on

Note: Once you have the estimate and design plans, you can confidently plan your financial strategy. If you’re working with a lender, now is a great time to contact our preferred mortgage partner to help with pre-qualification.

Gate 3Agreement

You Give Us: The initial investment and go-ahead to start dialing in your vision

We Give You: A 3D model and proposal

  • In this phase, we’ll get your sign-off on build plans, specifications, selection catalog, and construction agreement. We’ll also submit permit applications.
  • With your financial plan in place, we’ll begin ordering components and materials
  • We’ll also start scheduling resources for your project

Gate 4Construction

We Give You: Regular updates and milestone check-ins as we move through the project

You Give Us: Confirmation we’re on the same page as we move through the stages of construction

  • Before we get started, we’ll have a pre-construction meeting where you’ll meet your Site Manager to go over expectations and project logistics
  • The first major checkpoint will be the pre-mechanical meeting – At this meeting, we’ll go over the planned locations for electrical, plumbing and HVAC to make sure it aligns with your expectations before we get things installed
  • The next big step is the close-in walkthrough – Before we “close in” your ceilings and walls, the Site Manager will walk through the home with you to assure that devices, fixtures and lights are properly located
  • The final step is the pre-finish meeting – At this meeting, you’ll review all the final aesthetic choices such as flooring, cabinetry, countertops, backsplash, paint, and trim. We’ll confirm all details to ensure proper installation.

Gate 5Project Completion

We Give You: Your finished project and orientation information for your new space

You Give Us: Your feedback on the project

  • Your house has passed final inspection and your home is now ready for a Substantial Completion Review
  • You’ll tour the new space with your Site Manager and review the features and any maintenance requirements you’ll need to know about
  • After you’ve had time to settle in, we’ll visit with you to celebrate your completed project
  • About 60 days after completion, we’ll send you a survey to get your feedback on the project as a whole
  • Our Customer Service Team will be available to you for any questions that arise and will send a reminder before your one-year warranty expires

Frequently Asked QuestionsNeighborhood Homes

How long does the construction process take?

We typically complete construction 6 or 7 months after the home start date on your agreement of sale. Your New Home Sales Specialist will be able to verify your home start date once you’ve indicated that you’re ready to sign up to build.

Why is my home exposed to rain during construction?

This is completely normal during the framing and roofing stages, before your home is fully enclosed. The lumber, engineered wood, and subfloor materials used in your EGS home are built to handle temporary moisture exposure without affecting structural integrity. Once your home is “dried in” — meaning the roof, windows, and exterior barriers are in place — we inspect all installed materials and clear any remaining moisture before interior work begins. By the time insulation and drywall go in, your home is dry, secure, and ready for the next phase.

Do you use 2x4s for wall construction?

Most interior and exterior walls are built with 2x4s. Our exterior wall system uses 16” on center 2×4 with a 1” foam insulation sheathing, creating a continuous thermal break for a highly energy efficient and structurally sound wall. However, for below-ground structures, we use custom-manufactured, pre-insulated, precast foundations made by Weaver Superior Walls. They’re delivered by truck to your home site, and they’re the top choice for durability and energy efficiency.

Does EGStoltzfus offer 9-foot ceilings?

We do! There are 9-foot ceilings included on the first floor of our townhomes and carriage homes, and they are optional for first floors on our single-family homes.

What flooring materials are included?

Depending on the community, the base price includes Mohawk polyester-fiber carpet and sheet vinyl. Some communities also have engineered hardwood in the foyer. Additional flooring options include ceramic tile, Luxury Vinyl Tile (LVT), and Luxury Vinyl Plank (LVP).

Do your homes have second-floor laundries?

Yes! Many of our home plans allow inclusion of a second-floor laundry. If you’re interested in this feature, check out the Glen Mary, Danbury, Essington, Edison, Hartman, Cambridge, Lawrenceville, and the Rockford. Take a virtual tour of these home plans.

Is a finished basement included?

While we do offer the option to finish your basement, we don’t include a finished basement in our base price, since there are many different potential uses that can vary widely in cost. Plus, many new owners prefer to live in their home for a few years before deciding how they’d like to use the space, so they choose to defer a basement project until later.

Do you offer finished rooms over garages (FROGs)?

Finished rooms over garages (FROGs) are available in certain floor plans including the Cambridge, Rockford, and Magnolia. Take a virtual tour of these home plans.

Do your communities have Homeowner Associations (HOAs)?

Yes. All our communities have Homeowners Associations, or HOAs, that address community concerns. HOA dues vary by community and included amenities are also dependent on the neighborhood. Dues are set by the organizations but are generally minimal. Consult your New Home Sales Specialist for more information.

When will I know my closing or settlement date?

Most new home builders don’t issue a settlement until only 4 weeks prior! At the time of your contract signing, we’re able to provide a 4-week window for your expected settlement date! You’ll find out the exact day around the time of your mechanical orientation which is roughly 6-weeks to 8-weeks advance notice.

Read All FAQs

Frequently Asked QuestionsCustom Homes Design & Build

Can EGStoltzfus build a custom home on my land, or help me find a homesite?

Yes, we can do both. EGStoltzfus builds custom homes on land you already own, on single homesites we have for sale, and in our custom home neighborhoods throughout Lancaster County and south central Pennsylvania. If you own land, our team will assess your property and design a home suited to your site. We work within local zoning and deed restrictions and coordinate permitting with the municipality and our trade partners, so you don’t have to. If you’re still searching, our Where We Build page lists the custom homesites currently available.

Can I build a custom home in an established neighborhood?

Yes. EGStoltzfus custom home neighborhoods combine the freedom of a fully custom design with the setting and amenities of a planned community. Homesites are ready to build on, so you can focus on designing your home. Current custom neighborhoods include Brooklawn in Manheim Township, Laranbo Farm in the Conestoga Valley School District, and Warwick Crossing in the Warwick area.

Can I see examples of EGStoltzfus custom homes and hear from past clients?

Absolutely. Our Lookbook shows completed custom homes and remodels, and our Why Choose EGStoltzfus page shares stories from custom home, remodeling and neighborhood clients. EGStoltzfus Custom Homes & Remodeling also earned a 2026 Guildmaster Award, which recognizes builders for exceptional customer service.

Do I need my own home plan, or can EGStoltzfus design one for me?

You don’t need a plan to get started. EGStoltzfus offers three ways to design your custom home: Start with a Signature Custom Home Plan. These curated floor plans reflect 55+ years of custom home building, and you can personalize them to fit your needs. Bring your own plans. We’re happy to build from plans created by your architect or designer. Design from scratch. Our design-build team will work with you to create a one-of-a-kind home. Whichever path you choose, your design moves from a preliminary sketch to a 3D model, so you can see the flow and function of your home before construction begins.

What is the custom home building process with EGStoltzfus?

EGStoltzfus guides every custom home through a five-gate design-build process, with a dedicated team member at each stage: Discovery: Meet with a Design-Build Specialist to share your vision. You’ll get a preliminary sketch and a ballpark feasibility budget. Design & Evaluation: Your sketch becomes a 3D model. You’ll choose fixtures, flooring, cabinets and countertops with our design professionals, then receive a proposal and finished design plan. Agreement: You sign off on plans, specifications and the construction agreement. We submit permits, order materials and schedule resources. Construction: Your Site Manager walks you through key milestones, including pre-construction, pre-mechanical, close-in and pre-finish meetings, with regular updates along the way. Project Completion: After final inspection, you’ll tour your home at a Substantial Completion Review, and our Customer Service Team supports you through your warranty period. To get started, schedule a Discovery meeting.

Read All FAQs

EGStoltzfus New Construction & Custom Homes EGStoltzfus New Homes & Construction

New neighborhoods, design ideas, and helpful homebuying tips – right to your inbox:

"*" indicates required fields

This field is for validation purposes and should be left unchanged.
  • Find a Home
    • Quick Move-in Homes
    • Our Neighborhoods
    • Custom Home Design & Build
    • Floor Plans
    • Model Homes
  • Where We Build
    • Our Neighborhoods
    • Build on Your Land
    • Lancaster Area
    • Harrisburg Area
    • Mechanicsburg Area
    • York Area
    • Sell Your Land
  • Homebuyer Resources
    • Customer Care Hub
    • Financing Your Home
    • Closing Services
    • Homeowner Tips
    • Frequently Asked Questions
    • Special Offers & Incentives
  • About EGStoltzfus
    • Why Choose EGS?
    • Our Process
    • Meet the Team
    • News
    • Podcast
    • Careers
    • Trade Partners
    • Facebook Instagram LinkedIn YouTube
© 2026 EGStoltzfus Website by Infantree
Privacy Policy Terms & Conditions HIC Registration Number PA013123